by gnabgib on 4/29/25, 5:18 AM with 5 comments
by fnands on 4/29/25, 7:38 AM
Important milestone there. It's great to see that green energy projects are largely economically feasible without subsidies these days.
by Havoc on 4/29/25, 11:09 AM
by adaml_623 on 4/29/25, 7:45 AM
The turbine model V236-15.0 MW from Vestas features a capacity of 15 MW and a 236-meter diameter rotor with hub height of about 145 meter, highest tip of 263 meter.
... 236 meters